CEC Rule 8-200(2) House + Secondary Suite Electrical Load Calculator

Automated multi-dwelling demand calculation (100% largest unit + 65% second unit per Rule 8-202(3)) for basement apartments, laneway suites, and duplex permits.

✓ Instant 4-Page PDF + Vector SVG ✓ Zero Account Required ✓ 100% Inspector Acceptance Guarantee
CALCULATING...
0%
💡 Avoid a $4,500+ 200A Service Upgrade — Pass Inspection Legally with EVEMS
Code authorities (CEC Rule 8-106(10) & NEC 625.42) exclude EV demand when controlled by a listed Energy Management System:

Download Complete 4-Page Permit PDF + Vector Schematic

Instant self-serve download + 30-Day Magic Edit Link (change address or numbers anytime free).

Single Permit Packet
$29 One-Time
  • ✓ Full 4-Page Official Calculation PDF
  • ✓ Vector Single-Line Diagram (SLD)
  • ✓ 30-Day Magic Link (unlimited edits)
No Subscription · 5-Pack
$79 / 5 Permits
  • ✓ $15.80 per permit packet
  • ✓ Credits never expire
  • ✓ Your Company Logo + License #
Contractor Pro Unlimited
$39 / month
  • ✓ Unlimited Branded Permit PDFs
  • ✓ Company Logo & License Header
  • ✓ Cancel anytime in 1 click
🛡️ 100% AHJ / HOA Acceptance Guarantee: Full refund within 30 days if rejected. 🔒 Stripe · Apple Pay & Credit Card
LIVE 4-PAGE PERMIT PACKET PREVIEW
Site:
DOC: CP-2026-PREVIEW
🔒 Official Code Schedule & Vector Schematic Locked
Unlock instant 4-page PDF download + 30-day self-service editing above.
Ln Description & Prescriptive Formula Code Ref Input Calculated

Worked Prescriptive Calculation Example: CEC Rule 8-200(2) House + Secondary Suite Electrical Load Calculator

Below is a complete step-by-step mathematical schedule generated from standard nameplate ratings so municipal plan examiners, homeowners, and contractors can verify every code formula:

Line Step Description & Formula Code Reference Rating Calculated
1 Primary Dwelling Area (165.0 m²): 5,000 W first 90 m² + 1 × 1,000 W CEC 8-110 & 8-200(1)(a)(i-ii) 165.0 m² 6,000 W
2 Electric Range: 6,000 W base + 40% of rating exceeding 12,000 W CEC 8-200(1)(a)(iv) 12,000 W 6,000 W
4 Other Loads >1,500 W (Dryer 5,500 W + Fixed 4,500 W) @ 25% (Range provided) CEC 8-200(1)(a)(vii) 10,000 W 2,500 W
4B Secondary Suite (80 m²): Unit Calc 12,125 W -> Multi-Unit 100% Largest (14,500 W) + 65% 2nd Unit (7,881 W) CEC 8-200(2) & 8-202(3)(a) 12,125 W 7,881 W
5 Electric Space Heating (100% first 10 kW + 75% balance; interlocked w/ AC) CEC 8-200(1)(a)(iii) & 62-118 12,000 W 11,500 W
6 ChargePoint Home Flex (40A) — Monitored & Controlled by CSA-Listed EVEMS (0 W Service Demand) CEC 8-106(10)/(11) & 8-500 9,600 W 0 W
7 Total Calculated Service Demand — Greater of Item (a) 33,881 W or Min Floor (b) 24,000 W CEC 8-200(1)(b) Min Check 33,881 W

Frequently Asked Permit & Inspection Questions

How does CEC Rule 8-200(2) combine the main dwelling and basement secondary suite?

Each dwelling unit load is first calculated excluding space heating and air conditioning. Under Rule 8-202(3)(a), the combined feeder/service takes 100% of the unit with the heavier load plus 65% of the second unit, then adds heating/AC and EVSE loads.

Does adding a second electric stove in a basement suite require a 200A upgrade?

On a 100A panel, two electric ranges plus heating frequently exceed 24,000 W unless gas appliances or load-management controls are utilized. Running the exact 8-200(2) schedule verifies whether 100A, 125A, or 200A is required.