Instant CEC 2021 / 2024 single-dwelling demand calculation + vector Single-Line Diagram ready for Ontario ESA, Technical Safety BC, and Alberta municipal permits.
Instant self-serve download + 30-Day Magic Edit Link (change address or numbers anytime free).
| Ln | Description & Prescriptive Formula | Code Ref | Input | Calculated |
|---|
Below is a complete step-by-step mathematical schedule generated from standard nameplate ratings so municipal plan examiners, homeowners, and contractors can verify every code formula:
| Line | Step Description & Formula | Code Reference | Rating | Calculated |
|---|---|---|---|---|
| 1 | Living Area (145 m² + 75% of 60 m² bsmt = 190.0 m²): 5,000 W + 2 × 1,000 W | CEC 8-110 & 8-200(1)(a)(i-ii) | 190.0 m² | 7,000 W |
| 2 | Electric Range: 6,000 W base + 40% of rating exceeding 12,000 W | CEC 8-200(1)(a)(iv) | 12,000 W | 6,000 W |
| 4 | Other Loads >1,500 W (Dryer 5,500 W + Fixed 4,500 W) @ 25% (Range provided) | CEC 8-200(1)(a)(vii) | 10,000 W | 2,500 W |
| 5 | Air Conditioning / Heat Pump @ 100% (largest non-coincident w/ heating) | CEC 8-200(1)(a)(iii) & 62-118 | 3,600 W | 3,600 W |
| 6 | Tesla Wall Connector Gen 3 (48A) — Continuous EV Supply Equipment @ 100% | CEC 8-200(1)(a)(vi) | 11,520 W | 11,520 W |
| 7 | Total Calculated Service Demand — Greater of Item (a) 30,620 W or Min Floor (b) 24,000 W | CEC 8-200(1)(b) | Min Check | 30,620 W |
CEC Rule 8-110 counts 100% of the ground and upper floors plus 75% of basement floor area exceeding 1.8 m ceiling height. Rule 8-200(1)(a)(i)-(ii) assigns 5,000 W for the first 90 mu00b2 and 1,000 W for each additional 90 mu00b2 or fraction thereof.
Yes. Under CEC Rule 8-106(10) and (11), when a CSA-listed Electric Vehicle Energy Management System monitors the service feeders and sheds EVSE load automatically, 0 W is added to the service demand calculation.