| Ln | Description & Prescriptive Formula | Code Ref | Input | Calculated |
|---|
Below is a complete step-by-step mathematical schedule generated from standard nameplate ratings so municipal plan examiners, homeowners, and contractors can verify every code formula:
| Line | Step Description & Formula | Code Reference | Rating | Calculated |
|---|---|---|---|---|
| 1 | General Lighting & Receptacles: 2,150 sq.ft. × 3 VA/sq.ft. | NEC 2023 220.82(B)(1) | 6,450 VA | 6,450 VA |
| 2 | Small Appliance & Laundry Branch Circuits: 3 circuits × 1,500 VA | NEC 2023 220.82(B)(2) | 4,500 VA | 4,500 VA |
| 3 | Fastened-in-Place Appliances (Range 10,500 + Dryer 5,000 + Water/Other 4,800 VA) | NEC 2023 220.82(B)(3)-(4) | 20,300 VA | 20,300 VA |
| 4 | Optional General Demand Factor: 100% first 10,000 VA + 40% of remaining 21,250 VA | NEC 2023 220.82 Demand | 31,250 VA | 18,500 VA |
| 5 | Largest Non-Coincident HVAC Load: Air-Conditioning / Heat Pump @ 100% | NEC 2023 220.82(C) | 4,200 VA | 4,200 VA |
| 6 | ChargePoint Home Flex (48A Hardwired) — Continuous EVSE Load @ 125% Strict AHJ Mode | NEC 625.41 / Continuous | 11,520 VA | 14,400 VA |
| 7 | Total Calculated Dwelling Demand (37,100 VA ÷ 240V = 154.6 Amps) | NEC 2023 220.82 Total | — | 37,100 VA |